Taboo 1: The main materials, equipment and products used in construction are lack of technical quality identification documents or product certificates that meet the current national or ministerial standards.

Consequences: The project quality is unqualified, there are potential accidents, and it cannot be delivered for use on schedule, and it must be reworked and repaired; The construction period is delayed and the labor and material input is increased.

Measures: The main materials, equipment and products used in the water supply and drainage and heating and sanitation engineering should have technical quality identification documents or product certificates that meet the current standards issued by the state or ministry; The product name, model, specification, national quality standard code, delivery date, name and location of manufacturer, and inspection certificate or code of ex-factory products shall be indicated.

Taboo 2: The soft seal butterfly valve is not subject to necessary quality inspection before installation.

Consequences: During the system operation, the soft seal butterfly valve switch is not flexible, the closing is not tight, and water (steam) leakage occurs, resulting in rework and repair, and even affecting the normal water supply (steam).

Measures: Before the installation of the soft seal butterfly valve, the pressure strength and tightness test shall be carried out. 10% of each batch (the same brand, specification and model) shall be sampled for the test, and no less than one. For closed-circuit soft seal butterfly valves installed on the main pipe to cut off, strength and tightness tests shall be carried out one by one. The strength and tightness test pressure of the soft seal butterfly valve shall comply with the provisions of Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering (GB 50242-2002).

D71X manual wafer type soft seal butterfly valve

Taboo 3: The specification and model of installing the soft seal butterfly valve do not meet the design requirements. For example, the nominal pressure of the soft seal butterfly valve is less than the system test pressure; When the pipe diameter of the water supply branch pipe is less than or equal to 50mm, the gate valve is used; The main and riser pipes of hot water heating adopt stop valves; The suction pipe of fire pump adopts butterfly valve.

Consequence: It affects the normal opening and closing of the soft seal butterfly valve and the adjustment of resistance, pressure and other functions. Even in the system operation, the soft seal butterfly valve was damaged and forced to be repaired.

Measures: Be familiar with the application scope of various soft seal butterfly valves, and select the specifications and models of soft seal butterfly valves according to the design requirements. The nominal pressure of the soft seal butterfly valve shall meet the requirements of the system test pressure. According to the requirements of construction specifications: stop valves shall be used for water supply branch pipes with diameter less than or equal to 50mm; Gate valve shall be used when the pipe diameter is greater than 50mm. Gate valves shall be used for dry and vertical control valves of hot water heating, and butterfly valves shall not be used for suction pipes of fire water pumps.

Taboo 4: The installation method of soft seal butterfly valve is wrong. For example, the water (steam) flow direction of the stop valve or check valve is opposite to the sign, the valve rod is installed downward, the check valve installed horizontally is installed vertically, the handle of the rising stem gate valve or butterfly valve has no opening and closing space, and the valve rod of the concealed soft seal butterfly valve does not face the inspection door.

Consequences: The soft seal butterfly valve fails, the switch is difficult to repair, and the valve stem is downward, which often causes water leakage.

Measures: The installation shall be carried out in strict accordance with the installation instructions of the soft seal butterfly valve. The rising stem gate valve shall have sufficient valve stem extension opening height. The butterfly valve shall fully consider the handle rotation space. The various soft seal butterfly valve stems shall not be lower than the horizontal position, let alone downward. Concealed soft seal butterfly valve shall not only be equipped with inspection door meeting the opening and closing requirements of soft seal butterfly valve, but also the valve rod shall face the inspection door.

Taboo 5: The butterfly valve flange shall be ordinary soft seal butterfly valve flange.

Consequences: The size of the butterfly valve flange is different from that of the ordinary soft seal butterfly valve. Some flanges have small inner diameter, while the butterfly valve disc is large, which causes the soft seal butterfly valve to be damaged because it cannot be opened or hard to open.

Measures: The flange plate shall be processed according to the actual size of the butterfly valve flange.

Taboo 6: There are no reserved holes and embedded parts in the construction of building structure, or the reserved holes are too small and the embedded parts are not marked.

Consequences: During the construction of the heating and sanitation project, the building structure is chiseled, and even the stressed reinforcement is cut off, affecting the safety performance of the building.

Measures: Be familiar with the construction drawings of heating and sanitation works, actively and carefully cooperate with the construction of reserved holes and embedded parts in the building structure according to the needs of the installation of pipes and supports and hangers, and refer to the design requirements and construction specifications for details.

Taboo 7: During pipe welding, the staggered joint of the pipe is not on the same center line after the alignment, no gap is left for the alignment, the thick wall pipe is not beveled, and the width and height of the weld do not meet the requirements of the construction specification.

Consequence: The misalignment of the pipe is not at the same center line, which directly affects the welding quality and appearance quality. There is no gap in the butt joint, the thick wall pipe is not beveled, and the welding cannot meet the strength requirements when the width and height of the weld do not meet the requirements.

Measures: After welding the pipe butt joint, the pipe shall not be staggered, and the butt joint shall be on a central line. The gap shall be reserved. The thick wall pipe shall be beveled. In addition, the width and height of the weld shall be welded according to the specification requirements.

Taboo 8: The pipeline is directly buried on frozen soil and untreated loose soil, and the spacing and position of pipeline buttresses are improper, even in the form of dry bricks.

Consequence: due to the unstable support, the pipeline was damaged in the process of backfill compaction, resulting in rework and repair.

Measures: The pipeline shall not be buried on frozen soil and untreated loose soil. The spacing of buttresses shall meet the requirements of construction specifications. The buttresses shall be firm, especially at the pipeline interface, and shall not bear shear force. Brick buttress shall be built with cement mortar to ensure integrity and firmness.

Taboo 9: The expansion bolt used to fix the pipe support is of poor material, the hole diameter for installing the expansion bolt is too large, or the expansion bolt is installed on the brick wall or even the light wall.

Consequence: The pipe support is loose, and the pipe is deformed, even falling off.

Measures: The expansion bolts must be qualified products. If necessary, samples shall be taken for test and inspection. The hole diameter of the expansion bolts installed shall not be greater than the outer diameter of the expansion bolts by 2mm. The expansion bolts shall be applied to the concrete structure.

Taboo 10: The strength of the flange plate and gasket connected to the pipeline is not enough, and the connecting bolt is short or the diameter is thin. Rubber gaskets are used for heating pipes, asbestos gaskets are used for cold water pipes, and double-layer gaskets or inclined gaskets are used. Flange gaskets protrude into the pipes.

Consequence: The flange connection is not tight, even damaged, and leakage occurs. The flange gasket protrudes into the pipe, which will increase the water flow resistance.

Measures: The flange plate and gasket of the pipeline must meet the requirements of the design working pressure of the pipeline. The flange gasket of heating and hot water supply pipeline should be rubber asbestos pad; The flange gasket of water supply and drainage pipeline should be rubber gasket. The gasket of the flange shall not protrude into the pipe, and its outer circle shall reach the flange bolt hole. Bevel pad or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the hole diameter of the flange plate. The length of the bolt rod protruding from the nut should be 1/2 of the nut thickness.

Taboo 11: During the hydraulic strength test and tightness test of the pipeline system, only observe the pressure value and water level change, and the leakage inspection is not enough.

Consequence: leakage occurs after the pipeline system operates, affecting the normal use.

Measures: When the pipeline system is tested according to the design requirements and construction specifications, in addition to recording the pressure value or water level change within the specified time, it is necessary to carefully check whether there is leakage.

Taboo 12: sewage, rainwater and condensate pipes shall be concealed without closed water test.

Consequence: It may cause water leakage and user losses.

Measures: The closed water test shall be inspected and accepted in strict accordance with the specifications. The concealed sewage, rainwater and condensate pipes buried underground, in the ceiling and in the pipe room shall ensure no leakage.

Taboo 13: The pipeline system is not washed carefully before completion, and the flow and speed cannot meet the requirements of pipeline flushing. Even the hydraulic strength test is used to discharge water instead of flushing.

Consequence: The water quality can not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline section.

Measures: flush with the maximum set juice flow in the system or the water flow rate that should not be less than 3m/s. The color and transparency of the outlet water shall be consistent with that of the inlet water through visual inspection.

Taboo 14: water pressure test shall be conducted under negative temperature during winter construction.

Consequence: The pipe freezes due to the rapid freezing in the pipe during the hydraulic test.

Measures: try to carry out the hydraulic test before winter construction, and blow out the water after the pressure test, especially the water in the soft seal butterfly valve must be cleaned, otherwise the soft seal butterfly valve will freeze and crack. When the hydraulic test of the project must be carried out in winter, it should be carried out at a positive indoor temperature, and the water should be blown out after the pressure test. When the hydraulic test cannot be carried out, compressed air can be used for the test.


Wenzhou Longwan Donghai Butterfly Valve Factory

If you have any questions, suggestions and products you want to know, you can contact us at any time. Looking forward to your consultation!

Contact us

  • Phone:13123992527
  • Fax:0577-86912359
  • Tel:0577-86932698
  • Add:610-2 Airport Avenue, Longwan District, Wenzhou City

Online Message

WeChat

WeChat

九九热精品免费观看| 欧美日本国产| 你懂的日韩| 999精品视频在线| 国产一区精品| 99久久视频| 欧美一级视频高清片| 免费国产一级特黄aa大片在线| 99色视频| 欧美激情一区二区三区视频高清| 999久久久免费精品国产牛牛| 成人免费观看视频| 精品视频免费观看| 免费毛片播放| 日韩字幕在线| 久久精品店| 欧美a级v片不卡在线观看| 日韩在线观看视频网站| 麻豆系列 在线视频| 精品视频在线观看免费 | 在线观看导航| 国产a免费观看| 亚欧乱色一区二区三区| 日韩免费在线| 亚欧乱色一区二区三区| 亚洲精品影院| 国产伦精品一区二区三区在线观看 | 亚洲第一页乱| 亚飞与亚基在线观看| 亚欧成人毛片一区二区三区四区| 日韩av成人| 欧美另类videosbestsex久久| 国产不卡福利| 深夜做爰性大片中文| 欧美激情一区二区三区在线播放| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 日日夜夜婷婷| 久草免费资源| 国产亚洲精品aaa大片| 一级女性全黄久久生活片| 国产原创视频在线| 欧美18性精品| 亚欧成人毛片一区二区三区四区| 欧美日本国产| 国产伦久视频免费观看 视频| 日韩欧美一二三区| 精品毛片视频| 欧美激情一区二区三区视频| 韩国三级一区| 毛片高清| 国产伦精品一区二区三区在线观看 | 久久99中文字幕| 国产精品自拍一区| 成人影视在线播放| 精品视频一区二区| 美国一区二区三区| 青草国产在线观看| 国产网站在线| 亚洲天堂免费| 日本特黄特色aaa大片免费| 91麻豆国产福利精品| 高清一级毛片一本到免费观看| 午夜在线影院| 九九免费高清在线观看视频| 国产伦精品一区二区三区无广告 | 亚洲精品影院| 夜夜操网| 国产网站免费| 国产不卡福利| 亚洲wwwwww| 欧美国产日韩久久久| 欧美另类videosbestsex| 免费的黄色小视频| 日韩中文字幕在线观看视频| 四虎久久精品国产| 国产综合91天堂亚洲国产| 99色吧| 日韩av成人| 午夜激情视频在线播放| 91麻豆国产| 国产91精品系列在线观看| 午夜久久网| 国产福利免费观看| 亚洲wwwwww| 美国一区二区三区| 欧美α片无限看在线观看免费| 亚州视频一区二区| 亚欧成人毛片一区二区三区四区| 欧美国产日韩一区二区三区| 成人影院一区二区三区| 日韩av片免费播放| 二级片在线观看| 九九久久国产精品| 夜夜操网| 尤物视频网站在线| 99色吧| 国产亚洲精品成人a在线| 台湾美女古装一级毛片| 中文字幕一区二区三区精彩视频| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 久久国产一久久高清| 国产麻豆精品视频| 成人免费一级纶理片 | 国产成人精品综合| 一级女性全黄生活片免费| 欧美大片一区| 日韩欧美一二三区| 国产网站免费| 亚洲精品永久一区| 亚洲精品影院久久久久久| 国产高清在线精品一区二区| 国产精品自拍在线| 香蕉视频久久| 久久国产精品自线拍免费| 精品久久久久久中文| 成人在免费观看视频国产| 欧美激情一区二区三区在线| 久久99中文字幕| 国产麻豆精品视频| 九九热精品免费观看| a级黄色毛片免费播放视频| 青青青草影院| 国产一区免费观看| 一级女性全黄久久生活片| 免费一级生活片| 国产综合91天堂亚洲国产| 精品国产一区二区三区久| 日本特黄特色aaa大片免费| 香蕉视频亚洲一级| 国产成a人片在线观看视频 | 免费一级片网站| 欧美激情一区二区三区视频 | 日韩在线观看视频网站| 你懂的福利视频| 色综合久久久久综合体桃花网| 久草免费在线视频| 国产精品免费精品自在线观看| 国产视频一区二区在线观看| 欧美激情一区二区三区视频高清| 日本免费区| 黄色免费三级| 91麻豆爱豆果冻天美星空| 91麻豆国产| 99色视频在线观看| 尤物视频网站在线观看| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 国产精品自拍在线| 韩国毛片免费大片| 韩国毛片免费大片| 精品毛片视频| 成人影视在线播放| 精品久久久久久免费影院| 一级毛片视频免费| 久久成人综合网| 日日日夜夜操| 高清一级淫片a级中文字幕| 国产精品12| 一本高清在线| 天天做日日爱夜夜爽| 色综合久久手机在线| 国产网站免费在线观看| 日韩一级黄色大片| 欧美激情一区二区三区视频 | 免费毛片播放| 999精品影视在线观看| 精品视频一区二区三区| 999久久久免费精品国产牛牛| 精品视频在线观看视频免费视频 | 欧美国产日韩在线| 深夜做爰性大片中文| 九九九国产| 午夜在线亚洲| 欧美另类videosbestsex久久| 91麻豆国产福利精品| 台湾美女古装一级毛片| 色综合久久天天综合观看| 你懂的福利视频| 91麻豆精品国产片在线观看| 九九精品在线播放| 久久久久久久网| 欧美激情一区二区三区在线| 久久精品欧美一区二区| 精品在线观看一区| 久久国产一区二区| 日韩免费片| 黄色福利片| 国产一区二区精品久久| 成人免费一级纶理片 | 成人a级高清视频在线观看| 久久久久久久网| 九九九网站| 午夜在线观看视频免费 成人| 青青久久国产成人免费网站| 国产精品1024在线永久免费 | 日本在线www| 九九热国产视频| 国产一区二区高清视频| 日本在线不卡视频| 久久久久久久免费视频| 夜夜操网|