Your current location:HOME / NEWS / 14 taboos for installation of soft seal butterfly valve

14 taboos for installation of soft seal butterfly valve

date:[2023-02-03]     pk_hits:

Taboo 1: The main materials, equipment and products used in construction are lack of technical quality identification documents or product certificates that meet the current national or ministerial standards.

Consequences: The project quality is unqualified, there are potential accidents, and it cannot be delivered for use on schedule, and it must be reworked and repaired; The construction period is delayed and the labor and material input is increased.

Measures: The main materials, equipment and products used in the water supply and drainage and heating and sanitation engineering should have technical quality identification documents or product certificates that meet the current standards issued by the state or ministry; The product name, model, specification, national quality standard code, delivery date, name and location of manufacturer, and inspection certificate or code of ex-factory products shall be indicated.

Taboo 2: The soft seal butterfly valve is not subject to necessary quality inspection before installation.

Consequences: During the system operation, the soft seal butterfly valve switch is not flexible, the closing is not tight, and water (steam) leakage occurs, resulting in rework and repair, and even affecting the normal water supply (steam).

Measures: Before the installation of the soft seal butterfly valve, the pressure strength and tightness test shall be carried out. 10% of each batch (the same brand, specification and model) shall be sampled for the test, and no less than one. For closed-circuit soft seal butterfly valves installed on the main pipe to cut off, strength and tightness tests shall be carried out one by one. The strength and tightness test pressure of the soft seal butterfly valve shall comply with the provisions of Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering (GB 50242-2002).

D71X manual wafer type soft seal butterfly valve

Taboo 3: The specification and model of installing the soft seal butterfly valve do not meet the design requirements. For example, the nominal pressure of the soft seal butterfly valve is less than the system test pressure; When the pipe diameter of the water supply branch pipe is less than or equal to 50mm, the gate valve is used; The main and riser pipes of hot water heating adopt stop valves; The suction pipe of fire pump adopts butterfly valve.

Consequence: It affects the normal opening and closing of the soft seal butterfly valve and the adjustment of resistance, pressure and other functions. Even in the system operation, the soft seal butterfly valve was damaged and forced to be repaired.

Measures: Be familiar with the application scope of various soft seal butterfly valves, and select the specifications and models of soft seal butterfly valves according to the design requirements. The nominal pressure of the soft seal butterfly valve shall meet the requirements of the system test pressure. According to the requirements of construction specifications: stop valves shall be used for water supply branch pipes with diameter less than or equal to 50mm; Gate valve shall be used when the pipe diameter is greater than 50mm. Gate valves shall be used for dry and vertical control valves of hot water heating, and butterfly valves shall not be used for suction pipes of fire water pumps.

Taboo 4: The installation method of soft seal butterfly valve is wrong. For example, the water (steam) flow direction of the stop valve or check valve is opposite to the sign, the valve rod is installed downward, the check valve installed horizontally is installed vertically, the handle of the rising stem gate valve or butterfly valve has no opening and closing space, and the valve rod of the concealed soft seal butterfly valve does not face the inspection door.

Consequences: The soft seal butterfly valve fails, the switch is difficult to repair, and the valve stem is downward, which often causes water leakage.

Measures: The installation shall be carried out in strict accordance with the installation instructions of the soft seal butterfly valve. The rising stem gate valve shall have sufficient valve stem extension opening height. The butterfly valve shall fully consider the handle rotation space. The various soft seal butterfly valve stems shall not be lower than the horizontal position, let alone downward. Concealed soft seal butterfly valve shall not only be equipped with inspection door meeting the opening and closing requirements of soft seal butterfly valve, but also the valve rod shall face the inspection door.

Taboo 5: The butterfly valve flange shall be ordinary soft seal butterfly valve flange.

Consequences: The size of the butterfly valve flange is different from that of the ordinary soft seal butterfly valve. Some flanges have small inner diameter, while the butterfly valve disc is large, which causes the soft seal butterfly valve to be damaged because it cannot be opened or hard to open.

Measures: The flange plate shall be processed according to the actual size of the butterfly valve flange.

Taboo 6: There are no reserved holes and embedded parts in the construction of building structure, or the reserved holes are too small and the embedded parts are not marked.

Consequences: During the construction of the heating and sanitation project, the building structure is chiseled, and even the stressed reinforcement is cut off, affecting the safety performance of the building.

Measures: Be familiar with the construction drawings of heating and sanitation works, actively and carefully cooperate with the construction of reserved holes and embedded parts in the building structure according to the needs of the installation of pipes and supports and hangers, and refer to the design requirements and construction specifications for details.

Taboo 7: During pipe welding, the staggered joint of the pipe is not on the same center line after the alignment, no gap is left for the alignment, the thick wall pipe is not beveled, and the width and height of the weld do not meet the requirements of the construction specification.

Consequence: The misalignment of the pipe is not at the same center line, which directly affects the welding quality and appearance quality. There is no gap in the butt joint, the thick wall pipe is not beveled, and the welding cannot meet the strength requirements when the width and height of the weld do not meet the requirements.

Measures: After welding the pipe butt joint, the pipe shall not be staggered, and the butt joint shall be on a central line. The gap shall be reserved. The thick wall pipe shall be beveled. In addition, the width and height of the weld shall be welded according to the specification requirements.

Taboo 8: The pipeline is directly buried on frozen soil and untreated loose soil, and the spacing and position of pipeline buttresses are improper, even in the form of dry bricks.

Consequence: due to the unstable support, the pipeline was damaged in the process of backfill compaction, resulting in rework and repair.

Measures: The pipeline shall not be buried on frozen soil and untreated loose soil. The spacing of buttresses shall meet the requirements of construction specifications. The buttresses shall be firm, especially at the pipeline interface, and shall not bear shear force. Brick buttress shall be built with cement mortar to ensure integrity and firmness.

Taboo 9: The expansion bolt used to fix the pipe support is of poor material, the hole diameter for installing the expansion bolt is too large, or the expansion bolt is installed on the brick wall or even the light wall.

Consequence: The pipe support is loose, and the pipe is deformed, even falling off.

Measures: The expansion bolts must be qualified products. If necessary, samples shall be taken for test and inspection. The hole diameter of the expansion bolts installed shall not be greater than the outer diameter of the expansion bolts by 2mm. The expansion bolts shall be applied to the concrete structure.

Taboo 10: The strength of the flange plate and gasket connected to the pipeline is not enough, and the connecting bolt is short or the diameter is thin. Rubber gaskets are used for heating pipes, asbestos gaskets are used for cold water pipes, and double-layer gaskets or inclined gaskets are used. Flange gaskets protrude into the pipes.

Consequence: The flange connection is not tight, even damaged, and leakage occurs. The flange gasket protrudes into the pipe, which will increase the water flow resistance.

Measures: The flange plate and gasket of the pipeline must meet the requirements of the design working pressure of the pipeline. The flange gasket of heating and hot water supply pipeline should be rubber asbestos pad; The flange gasket of water supply and drainage pipeline should be rubber gasket. The gasket of the flange shall not protrude into the pipe, and its outer circle shall reach the flange bolt hole. Bevel pad or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the hole diameter of the flange plate. The length of the bolt rod protruding from the nut should be 1/2 of the nut thickness.

Taboo 11: During the hydraulic strength test and tightness test of the pipeline system, only observe the pressure value and water level change, and the leakage inspection is not enough.

Consequence: leakage occurs after the pipeline system operates, affecting the normal use.

Measures: When the pipeline system is tested according to the design requirements and construction specifications, in addition to recording the pressure value or water level change within the specified time, it is necessary to carefully check whether there is leakage.

Taboo 12: sewage, rainwater and condensate pipes shall be concealed without closed water test.

Consequence: It may cause water leakage and user losses.

Measures: The closed water test shall be inspected and accepted in strict accordance with the specifications. The concealed sewage, rainwater and condensate pipes buried underground, in the ceiling and in the pipe room shall ensure no leakage.

Taboo 13: The pipeline system is not washed carefully before completion, and the flow and speed cannot meet the requirements of pipeline flushing. Even the hydraulic strength test is used to discharge water instead of flushing.

Consequence: The water quality can not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline section.

Measures: flush with the maximum set juice flow in the system or the water flow rate that should not be less than 3m/s. The color and transparency of the outlet water shall be consistent with that of the inlet water through visual inspection.

Taboo 14: water pressure test shall be conducted under negative temperature during winter construction.

Consequence: The pipe freezes due to the rapid freezing in the pipe during the hydraulic test.

Measures: try to carry out the hydraulic test before winter construction, and blow out the water after the pressure test, especially the water in the soft seal butterfly valve must be cleaned, otherwise the soft seal butterfly valve will freeze and crack. When the hydraulic test of the project must be carried out in winter, it should be carried out at a positive indoor temperature, and the water should be blown out after the pressure test. When the hydraulic test cannot be carried out, compressed air can be used for the test.


Wenzhou Longwan Donghai Butterfly Valve Factory

If you have any questions, suggestions and products you want to know, you can contact us at any time. Looking forward to your consultation!

Contact us

  • Phone:13123992527
  • Fax:0577-86912359
  • Tel:0577-86932698
  • Add:610-2 Airport Avenue, Longwan District, Wenzhou City

Online Message

WeChat

WeChat

欧美激情在线精品video| 精品国产香蕉伊思人在线又爽又黄| 午夜家庭影院| 天天做日日干| 精品久久久久久中文字幕2017| 久久国产精品只做精品| 九九九在线视频| 在线观看成人网 | 久久99爰这里有精品国产| 欧美日本免费| 亚洲精品影院久久久久久| 美女免费精品高清毛片在线视| 国产成人啪精品| 国产不卡福利| 欧美激情一区二区三区中文字幕| 超级乱淫黄漫画免费| 日本特黄特色aa大片免费| 日韩中文字幕一区二区不卡| 天天色成人| 色综合久久天天综线观看| 国产一区精品| 精品国产香蕉伊思人在线又爽又黄| 欧美激情一区二区三区在线播放| 在线观看成人网 | 国产视频网站在线观看| 欧美a级大片| 久草免费资源| 国产麻豆精品| 国产一区免费观看| 超级乱淫黄漫画免费| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 日韩在线观看免费完整版视频| 你懂的福利视频| 天天做日日干| 国产91精品系列在线观看| 精品国产香蕉伊思人在线又爽又黄| 日日夜人人澡人人澡人人看免| 久久国产影院| 二级片在线观看| 九九干| 97视频免费在线| 青青久热| 久久国产影视免费精品| 天天做人人爱夜夜爽2020毛片| 国产亚洲男人的天堂在线观看| 国产成人啪精品视频免费软件| 香蕉视频三级| 久久精品大片| 精品视频在线看 | 色综合久久天天综合| 天天色色色| 久久久久久久免费视频| 欧美爱色| 香蕉视频三级| 精品视频免费看| 欧美日本免费| 欧美激情一区二区三区视频 | 国产a视频| 久久99爰这里有精品国产| 久久99这里只有精品国产| 美女免费黄网站| 一a一级片| 尤物视频网站在线| 国产伦精品一区二区三区无广告| 精品国产亚一区二区三区| 青青久久精品国产免费看| 国产成人精品综合在线| 可以免费看污视频的网站| 黄色福利片| 天天色色网| 国产网站麻豆精品视频| 一级毛片视频在线观看| 91麻豆精品国产片在线观看| 九九精品在线播放| 韩国毛片免费| 国产一区免费观看| 成人a级高清视频在线观看| 韩国三级视频在线观看| 国产欧美精品| 麻豆网站在线免费观看| 成人高清视频在线观看| 国产成人精品影视| 精品在线视频播放| 日韩免费片| 日韩avdvd| 国产不卡在线看| 精品毛片视频| 欧美1区| 国产视频在线免费观看| 久久99中文字幕| 午夜激情视频在线播放| 国产成人欧美一区二区三区的| 久草免费在线观看| 青青久久精品| 国产亚洲精品成人a在线| 国产91视频网| 999久久66久6只有精品| 国产亚洲精品成人a在线| 天天做日日爱| 国产一区精品| 韩国三级一区| 国产国产人免费视频成69堂| 久久久成人影院| 99热精品在线| 午夜在线亚洲| 日韩中文字幕一区二区不卡| 久久国产精品只做精品| 国产一级生活片| 99色精品| 国产高清视频免费观看| 中文字幕97| 日韩专区在线播放| 黄色福利片| 欧美1区| 久久精品免视看国产明星| 台湾美女古装一级毛片| 国产一区二区福利久久| 久久国产影视免费精品| 午夜欧美成人久久久久久| 欧美电影免费| 久久国产精品自由自在| 欧美一级视频免费| 亚洲爆爽| 国产伦精品一区二区三区无广告| 国产伦久视频免费观看 视频| 亚洲第一页乱| 99久久精品国产高清一区二区 | 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 国产极品精频在线观看| 免费国产在线观看| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 国产91精品一区二区| 999久久66久6只有精品| 青青青草影院 | 日本免费乱理伦片在线观看2018| 久久精品大片| 在线观看导航| 国产激情一区二区三区| 香蕉视频三级| 国产成人精品综合在线| 免费毛片播放| 精品国产一区二区三区久久久狼| 日本免费区| 日韩专区亚洲综合久久| 日韩一级黄色| 日本在线www| 精品在线观看国产| 免费国产在线观看| 色综合久久天天综合观看| 91麻豆国产级在线| a级毛片免费观看网站| 韩国三级一区| 中文字幕一区二区三区精彩视频 | 亚洲女人国产香蕉久久精品| 青青久热| 99久久精品国产国产毛片| 天天做日日爱| 九九免费高清在线观看视频| 精品国产亚洲人成在线| 九九精品在线播放| 欧美另类videosbestsex高清| 天天做日日爱夜夜爽| 国产一区二区精品| 九九久久99综合一区二区| 国产精品自拍亚洲| 一本伊大人香蕉高清在线观看| 日韩一级黄色| 99久久精品国产片| 国产网站免费| 黄视频网站免费| 国产高清在线精品一区二区 | 天天做日日爱| 欧美大片a一级毛片视频| 亚洲第一视频在线播放| 国产一区二区精品| 天天色成人| 免费国产在线观看| a级毛片免费全部播放| 精品美女| 免费的黄视频| 国产网站免费| 欧美另类videosbestsex| 精品久久久久久中文| 精品视频在线看 | 九九免费高清在线观看视频| 日韩中文字幕在线亚洲一区| 日本在线不卡免费视频一区| 精品视频在线观看视频免费视频| 国产极品白嫩美女在线观看看| 四虎影视库国产精品一区| 国产成人女人在线视频观看| 青青久久精品国产免费看| 天天色色网| 国产极品精频在线观看| 可以免费看毛片的网站| 午夜久久网| 成人高清视频免费观看| 国产亚洲免费观看| 精品国产一区二区三区久久久蜜臀| 亚洲天堂在线播放|